{"id":10891,"date":"2026-03-06T02:00:32","date_gmt":"2026-03-05T18:00:32","guid":{"rendered":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/"},"modified":"2026-03-06T02:00:32","modified_gmt":"2026-03-05T18:00:32","slug":"what-is-a-scrum-release-plan","status":"publish","type":"post","link":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/","title":{"rendered":"Qu&#8217;est-ce qu&#8217;un plan de livraison Scrum ?"},"content":{"rendered":"<div class=\"cl-preview-section\">Le but d&#8217;un plan de livraison est de pr\u00e9ciser quand diverses fonctionnalit\u00e9s ou le produit seront livr\u00e9s au client, permettant ainsi au <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/scrum-in-3-minutes\/\">Scrum<\/a>\u00e9quipe de communiquer la feuille de route et le calendrier de livraison du produit en cours de d\u00e9veloppement. Gr\u00e2ce \u00e0 une planification \u00e0 long terme, l&#8217;\u00e9quipe peut r\u00e9pondre aux attentes du <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-project-owner-role-in-scrum\/\">Product Owner<\/a>et des parties prenantes du projet, et aider \u00e0 r\u00e9pondre \u00e0 des questions cl\u00e9s telles que :<\/div>\n<div class=\"cl-preview-section\">\n<ul>\n<li>Quand serons-nous pr\u00eats ?<\/li>\n<li>Quelles fonctionnalit\u00e9s puis-je avoir \u00e0 la fin de l&#8217;ann\u00e9e ?<\/li>\n<li>Combien cela co\u00fbtera-t-il ?<\/li>\n<li>Identifier les dates cl\u00e9s et les jalons<\/li>\n<li>Coordonner les calendriers de d\u00e9veloppement des syst\u00e8mes d\u00e9pendants<\/li>\n<li>Aider \u00e0 \u00e9quilibrer la valeur commerciale et la qualit\u00e9 globale dans les contraintes de port\u00e9e, de calendrier et de budget<\/li>\n<\/ul>\n<\/div>\n<div class=\"cl-preview-section\">\n<h2 id=\"release-planning-patterns\">Mod\u00e8les de planification de livraison<\/h2>\n<\/div>\n<div class=\"cl-preview-section\">De nombreuses organisations ont leur propre rythme pour livrer des produits aux clients. Certaines choisissent de livrer apr\u00e8s chaque <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-sprint-in-scrum\/\">Sprint<\/a>. D&#8217;autres regroupent les r\u00e9sultats de plusieurs Sprints dans une seule version, comme indiqu\u00e9 dans le sch\u00e9ma ci-dessous. D&#8217;autres livrent imm\u00e9diatement apr\u00e8s la finalisation de chaque fonctionnalit\u00e9 \u2014 cette approche est couramment appel\u00e9e d\u00e9ploiement continu ou livraison continue.<\/div>\n<div class=\"cl-preview-section\"><img alt=\"Definition of Ready\" decoding=\"async\" src=\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\"\/><\/div>\n<div class=\"cl-preview-section\">D\u00e9finition de pr\u00eat<\/div>\n<div class=\"cl-preview-section\">Un plan de livraison est une feuille de route qui refl\u00e8te les attentes concernant les fonctionnalit\u00e9s \u00e0 impl\u00e9menter et leur date de finalisation. Selon la strat\u00e9gie de d\u00e9veloppement, il peut \u00eatre orient\u00e9 fonctionnalit\u00e9s \u2014 o\u00f9 l&#8217;objectif est de livrer une version une fois qu&#8217;un ensemble pr\u00e9d\u00e9fini de fonctionnalit\u00e9s est d\u00e9velopp\u00e9 \u2014 ou orient\u00e9 date, o\u00f9 la livraison a lieu \u00e0 un point de contr\u00f4le pr\u00e9d\u00e9fini. Si le projet est orient\u00e9 fonctionnalit\u00e9s, la somme totale de toutes les fonctionnalit\u00e9s d&#8217;une livraison peut \u00eatre divis\u00e9e par la <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-scrum-velocity\/\">vitesse<\/a>pour estimer le nombre de Sprints n\u00e9cessaires pour finaliser les fonctionnalit\u00e9s demand\u00e9es.<\/div>\n<div class=\"cl-preview-section\">\n<h2 id=\"do-you-need-a-pre-release-plan\">Avez-vous besoin d&#8217;un plan pr\u00e9alable \u00e0 la livraison ?<\/h2>\n<\/div>\n<div class=\"cl-preview-section\">La planification de livraison est un sujet controvers\u00e9 dans <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-agile-software-development\/\">Agile<\/a>. Bien que nous soyons souvent amen\u00e9s \u00e0 fournir des pr\u00e9visions concernant le co\u00fbt et le calendrier dans le monde des affaires, Scrum ne recommande pas la cr\u00e9ation d&#8217;un plan de livraison rigide et pr\u00e9d\u00e9fini. Voici quelques arguments contre la planification pr\u00e9alable :<\/div>\n<div class=\"cl-preview-section\">\n<ul>\n<li>Les clients voient souvent peu de valeur dans les plans de livraison et les consid\u00e8rent comme une perte de temps<\/li>\n<li>Les changements rapides dans de nombreux domaines valident le principe \u00ab Vous n&#8217;aurez pas besoin de cela \u00bb (YAGNI) \u2014 ce qui signifie que pr\u00e9voir les livraisons est inutile<\/li>\n<li>Ainsi, la seule valeur d&#8217;un plan de livraison pourrait \u00eatre la date initiale et le budget \u2014 rien d&#8217;autre<\/li>\n<\/ul>\n<\/div>\n<div class=\"cl-preview-section\">\n<h2 id=\"why-do-we-still-need-release-planning\">Pourquoi avons-nous encore besoin de la planification de livraison ?<\/h2>\n<\/div>\n<div class=\"cl-preview-section\">N\u00e9anmoins, les dates r\u00e9elles de livraison dans les environnements Agile tombent souvent en dessous des objectifs promis. Toutefois, disposer d&#8217;une feuille de route g\u00e9n\u00e9rale de livraison peut renforcer la confiance et fixer les attentes entre votre \u00e9quipe et les parties prenantes. En outre, une livraison doit tenir compte de tous les travaux suppl\u00e9mentaires \u00e0 accomplir, tels que la mise \u00e0 jour des sites web publics et la formation des \u00e9quipes de support client. Voici les principales raisons de r\u00e9aliser une planification de livraison dans Scrum :<\/div>\n<div class=\"cl-preview-section\">\n<ul>\n<li>Communication<\/li>\n<li>Outil de planification<\/li>\n<li>Valider la valeur par rapport au co\u00fbt<\/li>\n<li>D\u00e9finir le contexte g\u00e9n\u00e9ral<\/li>\n<\/ul>\n<\/div>\n<div class=\"cl-preview-section\">\n<h2 id=\"release-planning-example\">Exemple de planification de version :<\/h2>\n<\/div>\n<div class=\"cl-preview-section\">Les plans de version se pr\u00e9sentent sous de nombreux formats. Voici un exemple pour la planification ax\u00e9e sur les fonctionnalit\u00e9s\/donn\u00e9es :<\/div>\n<div class=\"cl-preview-section\"><img alt=\"Release Planning Example\" decoding=\"async\" src=\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/release-planning-example.png\"\/><\/div>\n<div class=\"cl-preview-section\">Exemple de planification de version<\/div>\n<div class=\"cl-preview-section\">Si le projet est pilot\u00e9 par une date, nous pouvons simplement multiplier la vitesse par le nombre de sprints pour d\u00e9terminer le volume total de travail pouvant \u00eatre accompli dans une p\u00e9riode donn\u00e9e.<\/div>\n<div class=\"cl-preview-section\"><img alt=\"Release Planning Driven by Velocity\" decoding=\"async\" src=\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/release-planning-drive-by-velocity.png\"\/><\/div>\n<div class=\"cl-preview-section\">Planification de version pilot\u00e9e par la vitesse<\/div>\n<div class=\"cl-preview-section\">Un plan de version n&#8217;est pas un document statique \u2014 il doit \u00eatre r\u00e9examin\u00e9 et mis \u00e0 jour r\u00e9guli\u00e8rement au fur et \u00e0 mesure que nous g\u00e9rons notre <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-product-backlog-in-scrum\/\">Product Backlog<\/a>. Lorsque de nouvelles informations deviennent disponibles (par exemple, les entr\u00e9es du Product Backlog Scrum sont mises \u00e0 jour ou ajust\u00e9es), le plan de version doit \u00eatre r\u00e9examin\u00e9 et r\u00e9vis\u00e9 en cons\u00e9quence.<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The goal of the release plan is when to deliver a variety of available functions or products to customers so that the Scrum team can outline the release and delivery plans for the products being developed. Through long-term planning, the team can meet the expectations of product owners and related project sponsors. (\u53d1\u5e03\u8ba1\u5212\u7684\u76ee\u6807\u662f\u4f55\u65f6\u5c06\u5404\u79cd\u53ef\u7528\u7684\u529f\u80fd\u6216\u4ea7\u54c1\u4ea4\u4ed8\u7ed9\u5ba2\u6237\uff0c\u4ee5\u4f7fScrum\u56e2\u961f\u80fd\u591f\u6982\u8ff0\u6b63\u5728\u5f00\u53d1\u7684\u4ea7\u54c1\u7684\u53d1\u5e03\u548c\u4ea4\u4ed8\u8ba1\u5212\u3002\u901a\u8fc7\u957f\u671f\u8ba1\u5212\uff0c\u56e2\u961f\u53ef\u4ee5\u6ee1\u8db3\u4ea7\u54c1\u8d1f\u8d23\u4eba\u548c\u76f8\u5173\u9879\u76ee\u53d1\u8d77\u4eba\u7684\u671f\u671b\u3002)<\/p>\n","protected":false},"author":3479,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_title":"Plan de version Scrum : d\u00e9finition, exemples et importance","_yoast_wpseo_metadesc":"Apprenez ce qu'est un plan de version Scrum, son objectif, ses types (ax\u00e9 sur les fonctionnalit\u00e9s vs. pilot\u00e9 par la date), et pourquoi il reste pertinent en Agile, m\u00eame s'il n'est pas strictement obligatoire.","fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[83],"tags":[],"class_list":["post-10891","post","type-post","status-publish","format-standard","hentry","category-scrum"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Plan de version Scrum : d\u00e9finition, exemples et importance<\/title>\n<meta name=\"description\" content=\"Apprenez ce qu&#039;est un plan de version Scrum, son objectif, ses types (ax\u00e9 sur les fonctionnalit\u00e9s vs. pilot\u00e9 par la date), et pourquoi il reste pertinent en Agile, m\u00eame s&#039;il n&#039;est pas strictement obligatoire.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Plan de version Scrum : d\u00e9finition, exemples et importance\" \/>\n<meta property=\"og:description\" content=\"Apprenez ce qu&#039;est un plan de version Scrum, son objectif, ses types (ax\u00e9 sur les fonctionnalit\u00e9s vs. pilot\u00e9 par la date), et pourquoi il reste pertinent en Agile, m\u00eame s&#039;il n&#039;est pas strictement obligatoire.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/\" \/>\n<meta property=\"og:site_name\" content=\"ArchiMetric French\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-05T18:00:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\" \/>\n<meta name=\"author\" content=\"archimetric@visual-paradigm.com\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"archimetric@visual-paradigm.com\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/\"},\"author\":{\"name\":\"archimetric@visual-paradigm.com\",\"@id\":\"https:\/\/www.archimetric.com\/fr\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28\"},\"headline\":\"Qu&#8217;est-ce qu&#8217;un plan de livraison Scrum ?\",\"datePublished\":\"2026-03-05T18:00:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/\"},\"wordCount\":734,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\",\"articleSection\":[\"Scrum\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/\",\"url\":\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/\",\"name\":\"Plan de version Scrum : d\u00e9finition, exemples et importance\",\"isPartOf\":{\"@id\":\"https:\/\/www.archimetric.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\",\"datePublished\":\"2026-03-05T18:00:32+00:00\",\"author\":{\"@id\":\"https:\/\/www.archimetric.com\/fr\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28\"},\"description\":\"Apprenez ce qu'est un plan de version Scrum, son objectif, ses types (ax\u00e9 sur les fonctionnalit\u00e9s vs. pilot\u00e9 par la date), et pourquoi il reste pertinent en Agile, m\u00eame s'il n'est pas strictement obligatoire.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#primaryimage\",\"url\":\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\",\"contentUrl\":\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.archimetric.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Qu&#8217;est-ce qu&#8217;un plan de livraison Scrum ?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.archimetric.com\/fr\/#website\",\"url\":\"https:\/\/www.archimetric.com\/fr\/\",\"name\":\"ArchiMetric French\",\"description\":\"EA, Dev Ops, Scrum, Agile and More\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.archimetric.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.archimetric.com\/fr\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28\",\"name\":\"archimetric@visual-paradigm.com\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.archimetric.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/de58c1924d83d002dbce0b79f74ba4b70e2f85238332df6cabc0227effdf470d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/de58c1924d83d002dbce0b79f74ba4b70e2f85238332df6cabc0227effdf470d?s=96&d=mm&r=g\",\"caption\":\"archimetric@visual-paradigm.com\"},\"url\":\"https:\/\/www.archimetric.com\/fr\/author\/archimetricvisual-paradigm-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Plan de version Scrum : d\u00e9finition, exemples et importance","description":"Apprenez ce qu'est un plan de version Scrum, son objectif, ses types (ax\u00e9 sur les fonctionnalit\u00e9s vs. pilot\u00e9 par la date), et pourquoi il reste pertinent en Agile, m\u00eame s'il n'est pas strictement obligatoire.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/","og_locale":"fr_FR","og_type":"article","og_title":"Plan de version Scrum : d\u00e9finition, exemples et importance","og_description":"Apprenez ce qu'est un plan de version Scrum, son objectif, ses types (ax\u00e9 sur les fonctionnalit\u00e9s vs. pilot\u00e9 par la date), et pourquoi il reste pertinent en Agile, m\u00eame s'il n'est pas strictement obligatoire.","og_url":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/","og_site_name":"ArchiMetric French","article_published_time":"2026-03-05T18:00:32+00:00","og_image":[{"url":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png","type":"","width":"","height":""}],"author":"archimetric@visual-paradigm.com","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"archimetric@visual-paradigm.com","Dur\u00e9e de lecture estim\u00e9e":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#article","isPartOf":{"@id":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/"},"author":{"name":"archimetric@visual-paradigm.com","@id":"https:\/\/www.archimetric.com\/fr\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28"},"headline":"Qu&#8217;est-ce qu&#8217;un plan de livraison Scrum ?","datePublished":"2026-03-05T18:00:32+00:00","mainEntityOfPage":{"@id":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/"},"wordCount":734,"commentCount":0,"image":{"@id":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png","articleSection":["Scrum"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/","url":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/","name":"Plan de version Scrum : d\u00e9finition, exemples et importance","isPartOf":{"@id":"https:\/\/www.archimetric.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#primaryimage"},"image":{"@id":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png","datePublished":"2026-03-05T18:00:32+00:00","author":{"@id":"https:\/\/www.archimetric.com\/fr\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28"},"description":"Apprenez ce qu'est un plan de version Scrum, son objectif, ses types (ax\u00e9 sur les fonctionnalit\u00e9s vs. pilot\u00e9 par la date), et pourquoi il reste pertinent en Agile, m\u00eame s'il n'est pas strictement obligatoire.","breadcrumb":{"@id":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#primaryimage","url":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png","contentUrl":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png"},{"@type":"BreadcrumbList","@id":"https:\/\/www.archimetric.com\/fr\/what-is-a-scrum-release-plan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.archimetric.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Qu&#8217;est-ce qu&#8217;un plan de livraison Scrum ?"}]},{"@type":"WebSite","@id":"https:\/\/www.archimetric.com\/fr\/#website","url":"https:\/\/www.archimetric.com\/fr\/","name":"ArchiMetric French","description":"EA, Dev Ops, Scrum, Agile and More","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.archimetric.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https:\/\/www.archimetric.com\/fr\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28","name":"archimetric@visual-paradigm.com","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.archimetric.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/de58c1924d83d002dbce0b79f74ba4b70e2f85238332df6cabc0227effdf470d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/de58c1924d83d002dbce0b79f74ba4b70e2f85238332df6cabc0227effdf470d?s=96&d=mm&r=g","caption":"archimetric@visual-paradigm.com"},"url":"https:\/\/www.archimetric.com\/fr\/author\/archimetricvisual-paradigm-com\/"}]}},"_links":{"self":[{"href":"https:\/\/www.archimetric.com\/fr\/wp-json\/wp\/v2\/posts\/10891","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.archimetric.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.archimetric.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.archimetric.com\/fr\/wp-json\/wp\/v2\/users\/3479"}],"replies":[{"embeddable":true,"href":"https:\/\/www.archimetric.com\/fr\/wp-json\/wp\/v2\/comments?post=10891"}],"version-history":[{"count":0,"href":"https:\/\/www.archimetric.com\/fr\/wp-json\/wp\/v2\/posts\/10891\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.archimetric.com\/fr\/wp-json\/wp\/v2\/media?parent=10891"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.archimetric.com\/fr\/wp-json\/wp\/v2\/categories?post=10891"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.archimetric.com\/fr\/wp-json\/wp\/v2\/tags?post=10891"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}