{"id":10893,"date":"2026-03-06T02:01:57","date_gmt":"2026-03-05T18:01:57","guid":{"rendered":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/"},"modified":"2026-03-06T02:01:57","modified_gmt":"2026-03-05T18:01:57","slug":"what-is-a-scrum-release-plan","status":"publish","type":"post","link":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/","title":{"rendered":"Apa Itu Rencana Rilis Scrum?"},"content":{"rendered":"<div class=\"cl-preview-section\">Tujuan dari rencana rilis adalah untuk menguraikan kapan berbagai fitur atau produk akan dikirimkan kepada pelanggan, memungkinkan tim <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/scrum-in-3-minutes\/\">Scrum<\/a> untuk berkomunikasi mengenai peta jalan dan jadwal pengiriman produk yang sedang dikembangkan. Melalui perencanaan jangka panjang, tim dapat memenuhi harapan dari <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-project-owner-role-in-scrum\/\">Pemilik Produk<\/a> dan pemangku kepentingan proyek, serta membantu menjawab pertanyaan-pertanyaan kunci seperti:<\/div>\n<div class=\"cl-preview-section\">\n<ul>\n<li>Kapan kita akan selesai?<\/li>\n<li>Fitur apa saja yang bisa saya miliki pada akhir tahun?<\/li>\n<li>Berapa biayanya?<\/li>\n<li>Tentukan tanggal-tanggal kunci dan tonggak penting<\/li>\n<li>Sinkronkan jadwal pengembangan untuk sistem yang saling tergantung<\/li>\n<li>Membantu menyeimbangkan nilai bisnis dan kualitas secara keseluruhan dalam batasan cakupan, jadwal, dan anggaran<\/li>\n<\/ul>\n<\/div>\n<div class=\"cl-preview-section\">\n<h2 id=\"release-planning-patterns\">Pola Perencanaan Rilis<\/h2>\n<\/div>\n<div class=\"cl-preview-section\">Banyak organisasi memiliki ritme sendiri dalam merilis produk kepada pelanggan. Beberapa memilih untuk merilis setelah setiap <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-sprint-in-scrum\/\">Sprint<\/a>. Beberapa lainnya mengelompokkan hasil dari beberapa Sprint menjadi satu versi, seperti yang ditunjukkan pada diagram di bawah ini. Beberapa lainnya merilis segera setelah setiap fitur selesai\u2014pendekatan ini umum dikenal sebagai pengiriman berkelanjutan atau pengiriman terus-menerus.<\/div>\n<div class=\"cl-preview-section\"><img alt=\"Definition of Ready\" decoding=\"async\" src=\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\"\/><\/div>\n<div class=\"cl-preview-section\">Definisi Siap<\/div>\n<div class=\"cl-preview-section\">Rencana rilis adalah peta jalan yang mencerminkan ekspektasi tentang fitur-fitur mana yang akan diimplementasikan dan kapan akan selesai. Tergantung pada strategi pengembangan, rencana ini bisa berbasis fitur\u2014di mana tujuannya adalah mengirimkan rilis setelah satu set fitur yang telah ditentukan selesai dikembangkan\u2014atau berbasis tanggal, di mana rilis terjadi pada titik waktu yang telah ditentukan sebelumnya. Jika proyek berbasis fitur, jumlah total semua fitur dalam rilis dapat dibagi dengan kecepatan yang diharapkan <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-scrum-velocity\/\">kecepatan<\/a> untuk memperkirakan jumlah Sprint yang dibutuhkan untuk menyelesaikan fitur-fitur yang diminta.<\/div>\n<div class=\"cl-preview-section\">\n<h2 id=\"do-you-need-a-pre-release-plan\">Apakah Anda Membutuhkan Rencana Pra-Rilis?<\/h2>\n<\/div>\n<div class=\"cl-preview-section\">Perencanaan rilis adalah topik yang kontroversial di <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-agile-software-development\/\">Agile<\/a>. Meskipun sering diminta untuk memberikan perkiraan mengenai biaya dan jadwal dalam dunia bisnis, Scrum tidak merekomendasikan membuat rencana rilis yang kaku dan telah ditentukan sebelumnya. Berikut adalah beberapa alasan yang menentang perencanaan rilis di awal:<\/div>\n<div class=\"cl-preview-section\">\n<ul>\n<li>Pelanggan sering tidak melihat nilai dalam rencana rilis dan menganggapnya sebagai pemborosan<\/li>\n<li>Perubahan cepat di banyak bidang memvalidasi prinsip \u201cAnda Tidak Akan Membutuhkannya\u201d (YAGNI)\u2014yang berarti perencanaan rilis di awal tidak perlu<\/li>\n<li>Dengan demikian, nilai satu-satunya dalam rencana rilis mungkin hanya tanggal dan anggaran awal\u2014tidak lebih dari itu<\/li>\n<\/ul>\n<\/div>\n<div class=\"cl-preview-section\">\n<h2 id=\"why-do-we-still-need-release-planning\">Mengapa Kita Masih Membutuhkan Perencanaan Rilis?<\/h2>\n<\/div>\n<div class=\"cl-preview-section\">Namun demikian, tanggal pengiriman dunia nyata dalam lingkungan Agile sering kali tidak mencapai target yang dijanjikan. Namun, memiliki peta jalan rilis umum dapat membangun kepercayaan dan menetapkan ekspektasi antara tim Anda dan pemangku kepentingan. Selain itu, rilis harus mempertimbangkan semua pekerjaan tambahan yang harus diselesaikan, seperti memperbarui situs web publik dan melatih tim dukungan pelanggan. Berikut adalah alasan utama melakukan perencanaan rilis dalam Scrum:<\/div>\n<div class=\"cl-preview-section\">\n<ul>\n<li>Komunikasi<\/li>\n<li>Alat perencanaan<\/li>\n<li>Validasi nilai dibandingkan biaya<\/li>\n<li>Tetapkan konteks keseluruhan<\/li>\n<\/ul>\n<\/div>\n<div class=\"cl-preview-section\">\n<h2 id=\"release-planning-example\">Contoh Perencanaan Rilis:<\/h2>\n<\/div>\n<div class=\"cl-preview-section\">Perencanaan rilis hadir dalam berbagai format. Berikut ini contoh untuk perencanaan berbasis fitur\/data:<\/div>\n<div class=\"cl-preview-section\"><img alt=\"Release Planning Example\" decoding=\"async\" src=\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/release-planning-example.png\"\/><\/div>\n<div class=\"cl-preview-section\">Contoh Perencanaan Rilis<\/div>\n<div class=\"cl-preview-section\">Jika proyek didorong oleh tanggal, kita dapat mengalikan kecepatan dengan jumlah Sprint untuk menentukan jumlah total pekerjaan yang dapat diselesaikan dalam jangka waktu tertentu.<\/div>\n<div class=\"cl-preview-section\"><img alt=\"Release Planning Driven by Velocity\" decoding=\"async\" src=\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/release-planning-drive-by-velocity.png\"\/><\/div>\n<div class=\"cl-preview-section\">Perencanaan Rilis yang Didorong oleh Kecepatan<\/div>\n<div class=\"cl-preview-section\">Perencanaan rilis bukan dokumen statis\u2014harus direvisi dan diperbarui secara berkala saat kita mengelola <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-product-backlog-in-scrum\/\">Backlog Produk<\/a>. Ketika informasi baru tersedia (misalnya, entri dalam Backlog Produk Scrum diperbarui atau disesuaikan), perencanaan rilis harus ditinjau dan direvisi sesuai.<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The goal of the release plan is when to deliver a variety of available functions or products to customers so that the Scrum team can outline the release and delivery plans for the products being developed. Through long-term planning, the team can meet the expectations of product owners and related project sponsors. (\u53d1\u5e03\u8ba1\u5212\u7684\u76ee\u6807\u662f\u4f55\u65f6\u5c06\u5404\u79cd\u53ef\u7528\u7684\u529f\u80fd\u6216\u4ea7\u54c1\u4ea4\u4ed8\u7ed9\u5ba2\u6237\uff0c\u4ee5\u4f7fScrum\u56e2\u961f\u80fd\u591f\u6982\u8ff0\u6b63\u5728\u5f00\u53d1\u7684\u4ea7\u54c1\u7684\u53d1\u5e03\u548c\u4ea4\u4ed8\u8ba1\u5212\u3002\u901a\u8fc7\u957f\u671f\u8ba1\u5212\uff0c\u56e2\u961f\u53ef\u4ee5\u6ee1\u8db3\u4ea7\u54c1\u8d1f\u8d23\u4eba\u548c\u76f8\u5173\u9879\u76ee\u53d1\u8d77\u4eba\u7684\u671f\u671b\u3002)<\/p>\n","protected":false},"author":3479,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_title":"Perencanaan Rilis Scrum: Definisi, Contoh, dan Mengapa Ini Penting","_yoast_wpseo_metadesc":"Pelajari apa itu perencanaan rilis Scrum, tujuannya, jenis-jenisnya (berbasis fitur vs. berbasis tanggal), dan mengapa tetap bernilai dalam Agile\u2014bahkan ketika tidak secara ketat diperlukan.","fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[83],"tags":[],"class_list":["post-10893","post","type-post","status-publish","format-standard","hentry","category-scrum"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Perencanaan Rilis Scrum: Definisi, Contoh, dan Mengapa Ini Penting<\/title>\n<meta name=\"description\" content=\"Pelajari apa itu perencanaan rilis Scrum, tujuannya, jenis-jenisnya (berbasis fitur vs. berbasis tanggal), dan mengapa tetap bernilai dalam Agile\u2014bahkan ketika tidak secara ketat diperlukan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/\" \/>\n<meta property=\"og:locale\" content=\"id_ID\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Perencanaan Rilis Scrum: Definisi, Contoh, dan Mengapa Ini Penting\" \/>\n<meta property=\"og:description\" content=\"Pelajari apa itu perencanaan rilis Scrum, tujuannya, jenis-jenisnya (berbasis fitur vs. berbasis tanggal), dan mengapa tetap bernilai dalam Agile\u2014bahkan ketika tidak secara ketat diperlukan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/\" \/>\n<meta property=\"og:site_name\" content=\"ArchiMetric Indonesian\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-05T18:01:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\" \/>\n<meta name=\"author\" content=\"archimetric@visual-paradigm.com\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Ditulis oleh\" \/>\n\t<meta name=\"twitter:data1\" content=\"archimetric@visual-paradigm.com\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimasi waktu membaca\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 menit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/\"},\"author\":{\"name\":\"archimetric@visual-paradigm.com\",\"@id\":\"https:\/\/www.archimetric.com\/id\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28\"},\"headline\":\"Apa Itu Rencana Rilis Scrum?\",\"datePublished\":\"2026-03-05T18:01:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/\"},\"wordCount\":506,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\",\"articleSection\":[\"Scrum\"],\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/\",\"url\":\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/\",\"name\":\"Perencanaan Rilis Scrum: Definisi, Contoh, dan Mengapa Ini Penting\",\"isPartOf\":{\"@id\":\"https:\/\/www.archimetric.com\/id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\",\"datePublished\":\"2026-03-05T18:01:57+00:00\",\"author\":{\"@id\":\"https:\/\/www.archimetric.com\/id\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28\"},\"description\":\"Pelajari apa itu perencanaan rilis Scrum, tujuannya, jenis-jenisnya (berbasis fitur vs. berbasis tanggal), dan mengapa tetap bernilai dalam Agile\u2014bahkan ketika tidak secara ketat diperlukan.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#breadcrumb\"},\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#primaryimage\",\"url\":\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\",\"contentUrl\":\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.archimetric.com\/id\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Apa Itu Rencana Rilis Scrum?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.archimetric.com\/id\/#website\",\"url\":\"https:\/\/www.archimetric.com\/id\/\",\"name\":\"ArchiMetric Indonesian\",\"description\":\"EA, Dev Ops, Scrum, Agile and More\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.archimetric.com\/id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"id\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.archimetric.com\/id\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28\",\"name\":\"archimetric@visual-paradigm.com\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\/\/www.archimetric.com\/id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/de58c1924d83d002dbce0b79f74ba4b70e2f85238332df6cabc0227effdf470d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/de58c1924d83d002dbce0b79f74ba4b70e2f85238332df6cabc0227effdf470d?s=96&d=mm&r=g\",\"caption\":\"archimetric@visual-paradigm.com\"},\"url\":\"https:\/\/www.archimetric.com\/id\/author\/archimetricvisual-paradigm-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Perencanaan Rilis Scrum: Definisi, Contoh, dan Mengapa Ini Penting","description":"Pelajari apa itu perencanaan rilis Scrum, tujuannya, jenis-jenisnya (berbasis fitur vs. berbasis tanggal), dan mengapa tetap bernilai dalam Agile\u2014bahkan ketika tidak secara ketat diperlukan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/","og_locale":"id_ID","og_type":"article","og_title":"Perencanaan Rilis Scrum: Definisi, Contoh, dan Mengapa Ini Penting","og_description":"Pelajari apa itu perencanaan rilis Scrum, tujuannya, jenis-jenisnya (berbasis fitur vs. berbasis tanggal), dan mengapa tetap bernilai dalam Agile\u2014bahkan ketika tidak secara ketat diperlukan.","og_url":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/","og_site_name":"ArchiMetric Indonesian","article_published_time":"2026-03-05T18:01:57+00:00","og_image":[{"url":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png","type":"","width":"","height":""}],"author":"archimetric@visual-paradigm.com","twitter_card":"summary_large_image","twitter_misc":{"Ditulis oleh":"archimetric@visual-paradigm.com","Estimasi waktu membaca":"3 menit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#article","isPartOf":{"@id":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/"},"author":{"name":"archimetric@visual-paradigm.com","@id":"https:\/\/www.archimetric.com\/id\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28"},"headline":"Apa Itu Rencana Rilis Scrum?","datePublished":"2026-03-05T18:01:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/"},"wordCount":506,"commentCount":0,"image":{"@id":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png","articleSection":["Scrum"],"inLanguage":"id","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/","url":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/","name":"Perencanaan Rilis Scrum: Definisi, Contoh, dan Mengapa Ini Penting","isPartOf":{"@id":"https:\/\/www.archimetric.com\/id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#primaryimage"},"image":{"@id":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png","datePublished":"2026-03-05T18:01:57+00:00","author":{"@id":"https:\/\/www.archimetric.com\/id\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28"},"description":"Pelajari apa itu perencanaan rilis Scrum, tujuannya, jenis-jenisnya (berbasis fitur vs. berbasis tanggal), dan mengapa tetap bernilai dalam Agile\u2014bahkan ketika tidak secara ketat diperlukan.","breadcrumb":{"@id":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#breadcrumb"},"inLanguage":"id","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/"]}]},{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#primaryimage","url":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png","contentUrl":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png"},{"@type":"BreadcrumbList","@id":"https:\/\/www.archimetric.com\/id\/what-is-a-scrum-release-plan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.archimetric.com\/id\/"},{"@type":"ListItem","position":2,"name":"Apa Itu Rencana Rilis Scrum?"}]},{"@type":"WebSite","@id":"https:\/\/www.archimetric.com\/id\/#website","url":"https:\/\/www.archimetric.com\/id\/","name":"ArchiMetric Indonesian","description":"EA, Dev Ops, Scrum, Agile and More","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.archimetric.com\/id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"id"},{"@type":"Person","@id":"https:\/\/www.archimetric.com\/id\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28","name":"archimetric@visual-paradigm.com","image":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/www.archimetric.com\/id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/de58c1924d83d002dbce0b79f74ba4b70e2f85238332df6cabc0227effdf470d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/de58c1924d83d002dbce0b79f74ba4b70e2f85238332df6cabc0227effdf470d?s=96&d=mm&r=g","caption":"archimetric@visual-paradigm.com"},"url":"https:\/\/www.archimetric.com\/id\/author\/archimetricvisual-paradigm-com\/"}]}},"_links":{"self":[{"href":"https:\/\/www.archimetric.com\/id\/wp-json\/wp\/v2\/posts\/10893","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.archimetric.com\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.archimetric.com\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.archimetric.com\/id\/wp-json\/wp\/v2\/users\/3479"}],"replies":[{"embeddable":true,"href":"https:\/\/www.archimetric.com\/id\/wp-json\/wp\/v2\/comments?post=10893"}],"version-history":[{"count":0,"href":"https:\/\/www.archimetric.com\/id\/wp-json\/wp\/v2\/posts\/10893\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.archimetric.com\/id\/wp-json\/wp\/v2\/media?parent=10893"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.archimetric.com\/id\/wp-json\/wp\/v2\/categories?post=10893"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.archimetric.com\/id\/wp-json\/wp\/v2\/tags?post=10893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}