{"id":10917,"date":"2026-03-06T02:56:49","date_gmt":"2026-03-05T18:56:49","guid":{"rendered":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/"},"modified":"2026-03-06T02:56:49","modified_gmt":"2026-03-05T18:56:49","slug":"definition-of-ready-in-scrum","status":"publish","type":"post","link":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/","title":{"rendered":"Defini\u00e7\u00e3o de Pronto no Scrum \u2013 O que \u00e9 e por que \u00e9 importante"},"content":{"rendered":"<div class=\"cl-preview-section\">Os usu\u00e1rios finais \u00e0s vezes surgem com novas ideias ou conceitos de funcionalidades. Esse conceito ser\u00e1 representado por um ou mais \u00e9picas e adicionado pelo <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-project-owner-role-in-scrum\/\">Propriet\u00e1rio do Produto<\/a> ao <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-product-backlog-in-scrum\/\">Backlog do Produto<\/a>. Trabalhando juntos, a equipe descobrir\u00e1 como transformar esse conceito em uma ou mais \u00e9picas, e depois <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-product-backlog-refinement\/\">refinar<\/a>elas em hist\u00f3rias de usu\u00e1rio menores e mais claras \u2014 como funcionalidades reais do produto \u2014 que ser\u00e3o inclu\u00eddas na pr\u00f3xima implementa\u00e7\u00e3o do sprint.<\/div>\n<div class=\"cl-preview-section\">O Propriet\u00e1rio do Produto pode definir um artefato chamado de &#8216;Defini\u00e7\u00e3o de Pronto&#8217; com a equipe para garantir que os itens no topo do backlog estejam prontos para entrar em um sprint, para que a equipe de desenvolvimento possa se comprometer com confian\u00e7a e conclu\u00ed-los at\u00e9 o final do sprint.<\/div>\n<div class=\"cl-preview-section\"><img alt=\"Definition of Ready\" decoding=\"async\" src=\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\"\/><\/div>\n<div class=\"cl-preview-section\">\n<h2 id=\"why-definition-of-ready\">Por que Defini\u00e7\u00e3o de Pronto?<\/h2>\n<\/div>\n<div class=\"cl-preview-section\">A Defini\u00e7\u00e3o de Pronto (DoR) \u00e9 um conjunto de crit\u00e9rios acordados que informa a todos quando algo est\u00e1 pronto para come\u00e7ar \u2014 por exemplo, quando uma hist\u00f3ria de usu\u00e1rio est\u00e1 pronta para entrar em um sprint, ou quando todas as condi\u00e7\u00f5es necess\u00e1rias est\u00e3o preenchidas para que a equipe comece o sprint. Uma DoR bem definida aumenta significativamente as chances da equipe Scrum de alcan\u00e7ar com sucesso seu <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/write-sprint-goal\/\">Objetivo do Sprint<\/a>. Aqui est\u00e1 uma lista de benef\u00edcios que uma DoR bem estruturada pode trazer para a equipe:<\/div>\n<div class=\"cl-preview-section\">\n<ul>\n<li>Mede o status de &#8216;prontid\u00e3o&#8217; dos itens do backlog<\/li>\n<li>Garante que os itens do backlog sejam considerados &#8216;suficientemente prontos&#8217;<\/li>\n<li>Ajuda a equipe a identificar quando o Propriet\u00e1rio do Produto ou outros membros est\u00e3o sobrecarregados<\/li>\n<li>Incentiva a responsabilidade m\u00fatua entre os membros da equipe<\/li>\n<li>Reduz a press\u00e3o da equipe para comprometer estimativas antes que uma hist\u00f3ria esteja verdadeiramente &#8216;pronta&#8217;<\/li>\n<li>Reduz o desvio de requisitos durante o desenvolvimento<\/li>\n<\/ul>\n<\/div>\n<div class=\"cl-preview-section\">\n<h2 id=\"example---definition-of-ready-for-sprint\">Exemplo \u2013 Defini\u00e7\u00e3o de Pronto para Sprint<\/h2>\n<\/div>\n<div class=\"cl-preview-section\">Equipes diferentes podem ter defini\u00e7\u00f5es diferentes de prontid\u00e3o \u2014 algumas exigem menos crit\u00e9rios. Por exemplo, algumas equipes apenas descrevem o valor para o usu\u00e1rio, priorizam o item e anotam como demonstr\u00e1-lo. A estimativa e a comunica\u00e7\u00e3o acontecem durante a <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-sprint-planning\/\">Planejamento do Sprint<\/a>reuni\u00e3o. Aqui est\u00e3o alguns itens de exemplo a considerar ao elaborar a DoR da sua equipe:<\/div>\n<div class=\"cl-preview-section\">\n<ul>\n<li>O <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-sprint-backlog-in-scrum\/\">Backlog do Sprint<\/a>est\u00e1 priorizado<\/li>\n<li>O Backlog do Sprint inclui todos os defeitos, hist\u00f3rias de usu\u00e1rio e outros trabalhos aos quais a equipe se compromete<\/li>\n<li>Sem trabalho oculto<\/li>\n<li>Todos os membros da equipe calcularam sua capacidade do Sprint<\/li>\n<li>Projeto em tempo integral = X horas por dia<\/li>\n<li>Todas as hist\u00f3rias de usu\u00e1rio atendem \u00e0 Defini\u00e7\u00e3o de Pronto<\/li>\n<\/ul>\n<\/div>\n<div class=\"cl-preview-section\">\n<h2 id=\"example---definition-of-ready-for-user-story\">Exemplo \u2013 Defini\u00e7\u00e3o de Pronto para Hist\u00f3ria de Usu\u00e1rio<\/h2>\n<\/div>\n<div class=\"cl-preview-section\">Esta se\u00e7\u00e3o mostra uma defini\u00e7\u00e3o de exemplo para a Prontid\u00e3o de uma hist\u00f3ria de usu\u00e1rio, juntamente com um exemplo para a Prontid\u00e3o do Sprint. Voc\u00ea pode adotar algumas dessas como base ou ponto de partida:<\/div>\n<div class=\"cl-preview-section\">\n<ul>\n<li>A hist\u00f3ria define claramente seu valor para o usu\u00e1rio.<\/li>\n<li>Os crit\u00e9rios de aceita\u00e7\u00e3o para a hist\u00f3ria est\u00e3o claramente definidos.<\/li>\n<li>As depend\u00eancias da hist\u00f3ria de usu\u00e1rio foram identificadas.<\/li>\n<li>A equipe de entrega aceitou a hist\u00f3ria de usu\u00e1rio.<\/li>\n<li>A <a href=\"https:\/\/www.visual-paradigm.com\/scrum\/scrum-in-3-minutes\/\">Scrum<\/a>equipe aceita os artefatos de experi\u00eancia do usu\u00e1rio.<\/li>\n<li>Os crit\u00e9rios de desempenho s\u00e3o definidos conforme apropriado.<\/li>\n<li>\u00c9 identificado quem ir\u00e1 aceitar a hist\u00f3ria de usu\u00e1rio.<\/li>\n<li>A equipe sabe como demonstrar a hist\u00f3ria.<\/li>\n<\/ul>\n<\/div>\n<div class=\"cl-preview-section\">\n<h2 id=\"summary\">Resumo<\/h2>\n<\/div>\n<div class=\"cl-preview-section\">O termo &#8220;Defini\u00e7\u00e3o de Pronto&#8221; n\u00e3o \u00e9 descrito no Guia do Scrum, ao contr\u00e1rio da hist\u00f3ria de usu\u00e1rio e dos crit\u00e9rios de aceita\u00e7\u00e3o nele embutidos. Talvez voc\u00ea possa ver a Defini\u00e7\u00e3o de Pronto como um componente da atividade de refinamento da lista de prioridades, em vez de us\u00e1-la como uma verifica\u00e7\u00e3o sequencial ou etapa de gate. O refinamento da lista de prioridades \u00e9 um processo cont\u00ednuo, portanto, n\u00e3o se limita a um \u00fanico evento \u2014 \u00e9 uma atividade.<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The product owner can work with the team to define an artifact called Definition of Ready to ensure that at the top of the backlog projects are ready to move to sprint so that the development team can confidently submit and complete them. The end of the sprint. (\u4ea7\u54c1\u6240\u6709\u8005\u53ef\u4ee5\u4e0e\u56e2\u961f\u4e00\u8d77\u5b9a\u4e49\u4e00\u4e2a\u540d\u4e3a\u201c Definition of Ready\u7684\u5b9a\u4e49\u201d\u7684\u5de5\u4ef6\uff0c\u4ee5\u786e\u4fdd\u79ef\u538b\u9876\u90e8\u7684\u9879\u76ee\u5df2\u51c6\u5907\u597d\u79fb\u52a8\u5230sprint\u4e2d\uff0c\u4ee5\u4fbf\u5f00\u53d1\u56e2\u961f\u53ef\u4ee5\u5728\u51b2\u523a\u7684\u7ed3\u675f\u4e4b\u524d\u81ea\u4fe1\u5730\u63d0\u4ea4\u5e76\u5b8c\u6210\u5b83\u4eec\u3002)<\/p>\n","protected":false},"author":3479,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_title":"Defini\u00e7\u00e3o de Pronto no Scrum \u2013 O que \u00e9 e por que importa","_yoast_wpseo_metadesc":"Aprenda o que \u00e9 a Defini\u00e7\u00e3o de Pronto (DoR) no Scrum, seus benef\u00edcios e exemplos para hist\u00f3rias de usu\u00e1rio e planejamento de sprint. Melhore a produtividade da equipe e o sucesso do sprint.","fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[83],"tags":[],"class_list":["post-10917","post","type-post","status-publish","format-standard","hentry","category-scrum"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Defini\u00e7\u00e3o de Pronto no Scrum \u2013 O que \u00e9 e por que importa<\/title>\n<meta name=\"description\" content=\"Aprenda o que \u00e9 a Defini\u00e7\u00e3o de Pronto (DoR) no Scrum, seus benef\u00edcios e exemplos para hist\u00f3rias de usu\u00e1rio e planejamento de sprint. Melhore a produtividade da equipe e o sucesso do sprint.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Defini\u00e7\u00e3o de Pronto no Scrum \u2013 O que \u00e9 e por que importa\" \/>\n<meta property=\"og:description\" content=\"Aprenda o que \u00e9 a Defini\u00e7\u00e3o de Pronto (DoR) no Scrum, seus benef\u00edcios e exemplos para hist\u00f3rias de usu\u00e1rio e planejamento de sprint. Melhore a produtividade da equipe e o sucesso do sprint.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/\" \/>\n<meta property=\"og:site_name\" content=\"ArchiMetric Portuguese\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-05T18:56:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\" \/>\n<meta name=\"author\" content=\"archimetric@visual-paradigm.com\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"archimetric@visual-paradigm.com\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/\"},\"author\":{\"name\":\"archimetric@visual-paradigm.com\",\"@id\":\"https:\/\/www.archimetric.com\/pt\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28\"},\"headline\":\"Defini\u00e7\u00e3o de Pronto no Scrum \u2013 O que \u00e9 e por que \u00e9 importante\",\"datePublished\":\"2026-03-05T18:56:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/\"},\"wordCount\":672,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\",\"articleSection\":[\"Scrum\"],\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/\",\"url\":\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/\",\"name\":\"Defini\u00e7\u00e3o de Pronto no Scrum \u2013 O que \u00e9 e por que importa\",\"isPartOf\":{\"@id\":\"https:\/\/www.archimetric.com\/pt\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\",\"datePublished\":\"2026-03-05T18:56:49+00:00\",\"author\":{\"@id\":\"https:\/\/www.archimetric.com\/pt\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28\"},\"description\":\"Aprenda o que \u00e9 a Defini\u00e7\u00e3o de Pronto (DoR) no Scrum, seus benef\u00edcios e exemplos para hist\u00f3rias de usu\u00e1rio e planejamento de sprint. Melhore a produtividade da equipe e o sucesso do sprint.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#primaryimage\",\"url\":\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\",\"contentUrl\":\"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.archimetric.com\/pt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Defini\u00e7\u00e3o de Pronto no Scrum \u2013 O que \u00e9 e por que \u00e9 importante\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.archimetric.com\/pt\/#website\",\"url\":\"https:\/\/www.archimetric.com\/pt\/\",\"name\":\"ArchiMetric Portuguese\",\"description\":\"EA, Dev Ops, Scrum, Agile and More\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.archimetric.com\/pt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.archimetric.com\/pt\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28\",\"name\":\"archimetric@visual-paradigm.com\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\/\/www.archimetric.com\/pt\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/de58c1924d83d002dbce0b79f74ba4b70e2f85238332df6cabc0227effdf470d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/de58c1924d83d002dbce0b79f74ba4b70e2f85238332df6cabc0227effdf470d?s=96&d=mm&r=g\",\"caption\":\"archimetric@visual-paradigm.com\"},\"url\":\"https:\/\/www.archimetric.com\/pt\/author\/archimetricvisual-paradigm-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Defini\u00e7\u00e3o de Pronto no Scrum \u2013 O que \u00e9 e por que importa","description":"Aprenda o que \u00e9 a Defini\u00e7\u00e3o de Pronto (DoR) no Scrum, seus benef\u00edcios e exemplos para hist\u00f3rias de usu\u00e1rio e planejamento de sprint. Melhore a produtividade da equipe e o sucesso do sprint.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/","og_locale":"pt_PT","og_type":"article","og_title":"Defini\u00e7\u00e3o de Pronto no Scrum \u2013 O que \u00e9 e por que importa","og_description":"Aprenda o que \u00e9 a Defini\u00e7\u00e3o de Pronto (DoR) no Scrum, seus benef\u00edcios e exemplos para hist\u00f3rias de usu\u00e1rio e planejamento de sprint. Melhore a produtividade da equipe e o sucesso do sprint.","og_url":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/","og_site_name":"ArchiMetric Portuguese","article_published_time":"2026-03-05T18:56:49+00:00","og_image":[{"url":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png","type":"","width":"","height":""}],"author":"archimetric@visual-paradigm.com","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"archimetric@visual-paradigm.com","Tempo estimado de leitura":"3 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#article","isPartOf":{"@id":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/"},"author":{"name":"archimetric@visual-paradigm.com","@id":"https:\/\/www.archimetric.com\/pt\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28"},"headline":"Defini\u00e7\u00e3o de Pronto no Scrum \u2013 O que \u00e9 e por que \u00e9 importante","datePublished":"2026-03-05T18:56:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/"},"wordCount":672,"commentCount":0,"image":{"@id":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#primaryimage"},"thumbnailUrl":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png","articleSection":["Scrum"],"inLanguage":"pt-PT","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/","url":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/","name":"Defini\u00e7\u00e3o de Pronto no Scrum \u2013 O que \u00e9 e por que importa","isPartOf":{"@id":"https:\/\/www.archimetric.com\/pt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#primaryimage"},"image":{"@id":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#primaryimage"},"thumbnailUrl":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png","datePublished":"2026-03-05T18:56:49+00:00","author":{"@id":"https:\/\/www.archimetric.com\/pt\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28"},"description":"Aprenda o que \u00e9 a Defini\u00e7\u00e3o de Pronto (DoR) no Scrum, seus benef\u00edcios e exemplos para hist\u00f3rias de usu\u00e1rio e planejamento de sprint. Melhore a produtividade da equipe e o sucesso do sprint.","breadcrumb":{"@id":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/"]}]},{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#primaryimage","url":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png","contentUrl":"https:\/\/www.archimetric.com\/wp-content\/uploads\/2022\/02\/definition-of-ready.png"},{"@type":"BreadcrumbList","@id":"https:\/\/www.archimetric.com\/pt\/definition-of-ready-in-scrum\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.archimetric.com\/pt\/"},{"@type":"ListItem","position":2,"name":"Defini\u00e7\u00e3o de Pronto no Scrum \u2013 O que \u00e9 e por que \u00e9 importante"}]},{"@type":"WebSite","@id":"https:\/\/www.archimetric.com\/pt\/#website","url":"https:\/\/www.archimetric.com\/pt\/","name":"ArchiMetric Portuguese","description":"EA, Dev Ops, Scrum, Agile and More","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.archimetric.com\/pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Person","@id":"https:\/\/www.archimetric.com\/pt\/#\/schema\/person\/e4027c9f5b602fc705716009e5671d28","name":"archimetric@visual-paradigm.com","image":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/www.archimetric.com\/pt\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/de58c1924d83d002dbce0b79f74ba4b70e2f85238332df6cabc0227effdf470d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/de58c1924d83d002dbce0b79f74ba4b70e2f85238332df6cabc0227effdf470d?s=96&d=mm&r=g","caption":"archimetric@visual-paradigm.com"},"url":"https:\/\/www.archimetric.com\/pt\/author\/archimetricvisual-paradigm-com\/"}]}},"_links":{"self":[{"href":"https:\/\/www.archimetric.com\/pt\/wp-json\/wp\/v2\/posts\/10917","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.archimetric.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.archimetric.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.archimetric.com\/pt\/wp-json\/wp\/v2\/users\/3479"}],"replies":[{"embeddable":true,"href":"https:\/\/www.archimetric.com\/pt\/wp-json\/wp\/v2\/comments?post=10917"}],"version-history":[{"count":0,"href":"https:\/\/www.archimetric.com\/pt\/wp-json\/wp\/v2\/posts\/10917\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.archimetric.com\/pt\/wp-json\/wp\/v2\/media?parent=10917"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.archimetric.com\/pt\/wp-json\/wp\/v2\/categories?post=10917"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.archimetric.com\/pt\/wp-json\/wp\/v2\/tags?post=10917"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}